ALL
FEES ARE NON REFUNDABLE
Building Department: |
|
Building Permit |
plus $20 per $1,000 for the next $24,000 of cost; plus $30 per $1,000 for the next $150,000 of cost; plus $20 per $1,000 for the remaining cost. *In addition, if the Village needs special services of outside consultants to act on a permit, an expense deposit is required equal to $1,500 plus $5 per $1,000 of cost. |
|
|
|
plus $200 for the first $1,000 of cost; plus $20 per $1,000 for the next $24,000 of cost; plus $30 per $1,000 for the next $150,000 of cost; |
|
Application Fee: $500 plus $15 per $1,000 of cost up to $150,000; plus $20 per $1,000 of remaining cost; plus deposit, if required, per above* |
Building Permit Extension | |
Residential | 1st Extension 50% of original permit fee 2nd Extension 50% of the original permit fee |
Commercial |
1st Extension 50% of original permit fee 2nd Extension 50% of the original permit fee |
Once expired, nust apply for a new permit and pay required fee |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Residential | $100 |
Commercial | $200 |
|
|
Single Family | $100 plus $15 per $1,000 of cost |
All other |
|
|
|
Single Family | $100 plus $15 per $1,000 of cost |
All other |
|
|
|
|
plus required special permit from Board of Trustees ($500) |
Street Opening Permit | $500 plus $5,000 deposit |
(non-current open permit where plans are on file with the Village and conform to the work completed) |
$500 Greater of $300 per floor level or $50 per 1,000 sq. ft. |
Certification of Completion to Legalize and Maintain (for old structures build without permits) |
|
Residential | $250 plus all required building permit fees (doubled) to maintain an existing structure |
All other |
|
|
|
1 & 2 family homes | $500 plus $3,000 expense deposit |
All other |
|
|
|
|
|
Application to Board of Trustees | $500 (for any type of permt not otherwise listed) |
|
|
Preliminary Subdivision Approval | $1,250 per lot |
Final Subdivision Approval | $1,250 per lot |
Waiver of Subdivision Approval |
$1,250 per lot, but not to exceed $5,000 |
Small Cell Site Permit |
Up to five (5) proposed facilities located on existing poles or structures: |
$500, plus $3,000 expense deposit | |
For location on a new pole or
structure: |
|
$1,000 per unit, plus $3,000 expense deposit | |
Annual renewal of Small Cell Site
Permit: |
|
$270 per facility | |
|
*Minimum $5,000 to be maintained at all times |
|
|
|
|
Commercial | $500 |
Non-Commericial | $500 |
|
|
Residential | $50 |
Commercial |
|
|
|
Tax Lien Filing/Redemption | $500 per document, per tax lot |